The company attaches great importance to environmental protection as well as product quality while vigorously improving the economic benefits of the enterprise. Based on the principle of creating a good production and living environment for the employees and surrounding residents of the enterprise, the leaders of the company plan to collect and dispose the gas generated in the operation process, so as to completely eliminate the development potential of the enterprise. Entrusted by the company, Shandong Baolan Environmental Protection Engineering Co., Ltd. prepared the preliminary design scheme for waste gas treatment. Based on the design principles of mature and reliable technology, reasonable overall layout, convenient operation and management, and low treatment cost, we have prepared this plan.
According to the operation cost and safety of the waste gas treated in the project, the process route of the project adopts the "ionization catcher" as the core process to treat the waste gas of the project. The process route of the project is shown in the figure below:
Process Description: the waste gas of three biomass boilers is collected and enters the ionization catcher through the pipeline at the same time. When the flue gas passes through, the dust and tar substances in the flue gas are ionized under the action of electric charge, moving to the charged metal wire and pipe wall, and losing the electric charge. When the impurity mass adsorbed on the precipitation pole increases to greater than its adhesion, it will automatically under the action of gravity It flows downward to discharge from the bottom of the ionization trapper, and the net gas leaves from the top of the ionization trapper and enters the next process, so that the pollutants can be degraded and removed, and the treated flue gas can be discharged through the fan chimney up to the standard.